Stellar Electric completed a full re-wire of the three-story walkup and upgraded the building’s electrical service, doubling amperage. Work was designed for reliability, modern load requirements, and smooth sign-off at inspection.
Scope highlights (optional bullets):
- Full building re-wire across all floors
- Electrical service upgrade, increased capacity (2x amperage)
- Testing, labeling, and inspection readiness